竞彩足球推荐(www.99cx.vip):Work on Phase 2 of Sarawak-Sabah link road, Trans-Borneo Highway to begin next year
Prime Minister Ismail Sabri Yaakob says construction of Phase 2 of the Sarawak-Sabah link road and the Trans-Borneo Highway will start early next year. – The Malaysian Insight file pic, August 7, 2022.皇冠怎么注册用户(www.hg108.vip)皇冠怎么注册用户?皇冠真会员、代理注册其实很简单。访问网址www.hg108.vip,点击注册,然后充值USDT(需要实现到欧易平台购买到USDT),充值成功后,页面会展示账号资料给您。hg108.vip是皇冠正网在线上开设使用USDT充值、USDT结算的直营平台,资金安全,匿名性高。
THE federal government has approved the construction of Phase 2 of the Sarawak-Sabah link road (SSLR) and the Trans-Borneo Highway (LTB), which will commence early next year, Prime Minister Ismail Sabri Yaakob said.
He said the technical study of the two projects that connect Miri to Limbang and Lawas, and are expected to take three to five years to complete, is now at the final stage.
He said the projects will not only enable residents in northern Sarawak to go to Sabah via two road network options but also provide benefit to those living around Mulu, Long Seridan, Nanga Medamit, Long Lopeng, Ba’kelalan and Merarap, who still depend on logging roads.
“Those travelling from Miri to Limbang and Lawas via Brunei can use the 96km LTB stretch, which will be ugpraded into a two-lane dual-carriageway.
“For those who choose to avoid going through Brunei to go to (Sabah), they can travel via the SSLR Phase 2, which spans 326km and is a continuation of the SSLR Phase 1 from Simpang Gelugus to Long Lopeng,” he said when opening the Pujut section of the Sarawak portion of the Pan Borneo Highway, in Miri today.
Also present were Sarawak Premier Abang Johari Openg and Senior Works Minister Fadillah Yusof.
,,竞彩足球推荐(www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。竞彩足球推荐上足球分析专家数据更新最快。竞彩足球推荐开放皇冠官方会员注册、皇冠官方代理开户等业务。
Ismail said the projects, which cost RM10.62 billion, will also enable communities and residents in Miri, Limbang and Lawas to enjoy a safer and more comfortable road network.
On the opening of the Pujut section of the Pan Borneo Highway, Ismail said it was a continuation of the successful construction of highway projects in the peninsula.
“The implementation of the Pan Borneo Highway project is the federal government’s commitment to develop a planned, systematic and efficient infrastructure network for Keluarga Malaysia in Sarawak,” he said.
“The scope of this Pujut section construction involves upgrading of the federal roads, the construction of two bridges and four bus stops, which started on November 1, 2016 and was fully completed on July 2.”
Ismail said the project will also expand transport network and connectivity between towns and districts to potential growth centres such as ports, industrial areas and commercial centres along the route.
The 15.9km stretch of the Pujut section of the Pan Borneo Highway, which connects the Miri Airport intersection and the Pujut link road, was built at an estimated cost of RM470 million. – Bernama, August 7, 2022.
网友评论
澳门百家樂玩法
回复警方将嫌疑人当场逮捕,正调查其具体犯罪动机。报道称,嫌疑人曾在日本政治相关团体担任多治见市支部长,该团体成员一致表示,嫌疑人平时非常稳重,对此事难以置信。高木在演讲结束后赴医治疗,并称「脖子突然被掐住,很痛。完全不认识对方。」666高级网文